Send Message
China Butt Weld Fittings manufacturer

TOBO GROUP  

TOBO International Trading(Shanghia)Co.,Ltd       Tianda Oil Pipe Co., Ltd

TOBO Pipeline Equipment Co.,Ltd        TPCO & TISCO Pipe(Tianjin)Co.,Ltd.                        

News

March 31, 2022

aluminum alloy pipe 7075 7010 tube drawn seamless pipe for industry

aluminum alloy pipe 7075 7010 tube drawn seamless pipe for industry

Product Description
SPECIFICATIONS FOR 25 TON CRAWLER EXCAVATOR
 
Production name
 
aluminum alloy pipe 7075 7010 tube drawn seamless
 
 
 
Size
Width
0-1500mm
length
custom
Thickness
custom
certification
GB/T 3880-2006
Quality Control
100% Inspection
 
 
 
material
1000 series (pure aluminium )
4000 series (aluminum alloy )
7000 series (aluminum alloy )
2000 series (aluminum alloy )
5000 series (aluminum alloy )
8000 series (aluminum alloy )
3000 series (aluminum alloy )
6000 series (aluminum alloy )
Special aluminum material

 

Main Features

1) 2000 series aluminum alloy plate has high hardness and is suitable for aviation field

2)3000 series aluminum plate has good corrosion resistance and is suitable for wet environment.

3)4000 series aluminum plate is characterized by wear resistance, heat resistance, belongs to the building materials

4) 5000 series aluminum plate is characterized by good ductility and light weight, it belongs to the hot rolled plate and can be oxidized processing

5)8000 series are often used for aluminum foil, such as food packaging, tableware

latest company news about aluminum alloy pipe 7075 7010 tube drawn seamless pipe for industry  0

latest company news about aluminum alloy pipe 7075 7010 tube drawn seamless pipe for industry  1latest company news about aluminum alloy pipe 7075 7010 tube drawn seamless pipe for industry  2

 

Our Service

· Defect free Aluminum and other products
· Stern check on Procuring Process
· Maximum customer satisfaction
· Total quality management
· Competitive Prices
· Experienced Workers
· Regular Quality Checks in Testing Labs
· Good financial position
· Ultra Modern Storage Facility
· Well-organized Logistic facility

Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team

Packing & Delivery

Packing Details : seaworthy export wooden pallet

Delivery Details : 20-30 days after order

1. Special logistics packaging
 
2. Suitable carton size
 
3. Shock bubble film
 
4. Professional placement
5. Complete package
 
6. Shipping
Our Advantages

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1. Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 
Packaging&Shipping

Package:Standard export carton packing.

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

Contact Details