September 23, 2021
Product Description
| Brand Name | TOBO | 
| Product Name | 90 Degree LR Elbow | 
| Item | 32760 90D Elbow | 
| Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED | 
| Place of Origin | Shanghai China (Mainland) | 
| Size | DN15-DN1200 / 1-48 inch | 
| Material | Carbon steel(ASTM A105,A350LF2,A350LF3,) | 
| Stainless steel(ASTM A182 F304, F304L,F316,F316L,F321, F347,F310F44F51,A276 S31803, A182,  | 
		|
| F43, A276 S32750,A705 631,632,A961, A484, | |
| T91 (P91) | |
| F12,F11,F22,F5,F9,F91,F1ECT) | |
| Standard | DIN,EN,ASTM,BS,JIS,GB,ASME(ASME16.9/16.20) | 
| Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc | 
| Minimum Order Quantity | 1kg | 
| Price | Depending on quantity | 
| Payment Terms | T/T or Western Union or LC | 
| Supply Ability | 30tons per month | 
| Delivery Time | 10-50 days depending on quantity | 
| Packaging Details | PLY-WOODEN CASE | 
| Product Name | Nickel Alloy Pipe fittings | Product Type | buttweld | 
| Size | 1/2 Inch (16 mm OD) to 16 Inch (419 mm OD) | Cu(Min) | 90% | 
| Connection | Welding | Shape | Equal | 
| Wall Thickness | Sch5S-Sch160, XS,XXS | Applications | Petroleum,chemical,power,gas,metallurgy, shipbuilding, construction, etc | 
| Standard | EEMUA,ANSI/ ASTM B16.9, DIN, JIS, ISO, GB AND etc | 
| Minimum Order Quantity: | 1pcs | 
| Price: | Depending on quantity | 
| Payment Terms: | T/T or Western Union or LC | 
| Supply Ability: | 3,0000pcs per month | 
| Delivery Time: | 10-100 days depending on quantity | 
| Packaging Details: | PLY-WOODEN CASE OR PALLET | 
We are manufacturer ,You can see the Alibaba certification.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
| Package: | :Standard export carton packing. | 
| Delivery time: | stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity. | 
![]()