Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
TOBO GROUP
TOBO International Trading(Shanghia)Co.,Ltd Tianda Oil Pipe Co., Ltd
TOBO Pipeline Equipment Co.,Ltd TPCO & TISCO Pipe(Tianjin)Co.,Ltd.
Place of Origin: | China/Japan/Germany |
---|---|
Brand Name: | TOBO/TPCO/TISCO/VALIN/METAL |
Certification: | ISO/PED/TUV/SGS/LR/BV |
Model Number: | Hastelloy C-22 UNS N06022 |
Minimum Order Quantity: | 300 Kilogram/Kilograms |
Packaging Details: | Export standards or customer requirements |
Delivery Time: | 7-30 working days after received deposit |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 50 Metric Ton/Metric Tons per Month |
Product Name: | ELBOW | Product Type: | Steel Pipe |
---|---|---|---|
Grade: | 200 Series &300 Series &400 Series | Shape: | Round |
OD: | 168.3 - 3048 Mm | Surface: | Painted |
Application: | Oil Pipe | Techinque: | Cold Drawn |
Highlight: | marine stainless steel tubing,seamless stainless steel tube |
Pipe Fittings Hastelloy C-22 UNS N06022 NACE MR0175 1'' ELBOW LR 90 DEG
Although ductile enough to be formed by cold working, intermediate annealing may be necessary due to work hardening. Forging should be performed between 1750-2050° F followed by rapid cooling. Annealing can be performed at a temperature range between 2020-2150° F followed by a rapid quench. Cooling at an accelerated rate avoids the formation of detrimental phases which form between 1400-1800° F. Welding can be done by gas tungsten-arc, gas metal-arc and shielded metal-arc processes.
Pipe Smls | Pipe Welded | Tube Smls | Tube Welded | Sheet/Plate | Bar | Forging | Fitting |
B622 | B619 | B622 | B626 | B575 | B574 | B564 | B366 |
Typical Room Temperature Tensile Properties of Annealed Material
Product Form | Tensile (ksi) | .2% Yield (ksi) | Elongation % | Hardness (HRb) |
Plate (.25”-1.75”) | 112 | 53 | 62 | 89 |
Sheet (.038”-.15”) | 122 | 63 | 54 | 93 |
Bar (.50”-5.50”) | 115 | 55 | 60 | 89 |
Product Specification |
Name | pipe fitting elbow | |
Material | stainless steel | ASTM A240 304 304L 316L 321 321H 347 347H 904L ASTM A789 S31803 S32205 S32750 |
Carbon Steel | ASTM A234 WPB A420 WPL3 WPL6 A516 GR70 GR65 GR60 GR55 ISO3183/API 5L L36/X52 L415/X60 L450/X65 L485/X70? | |
Alloy Steel | ASTM A335 P11 P22 SA387 GR.11 GR.22 | |
Titanium | Gr1 Gr2 Gr3 Gr5 Gr7 Gr12 | |
Copper/Brass | We can also produce according to customer's requirements | |
Standard?? | ASME B16.9, ANSI B16.9, ASTM , JISB2312,DIN,BS, GBT12459-05, GB13401-05,GOST | |
ASME B16.9-2007,MSS SP 43-1991,MSS SP-75,ASTM B363 | ||
Wall thickness |
Sch5S, Sch10S, Sch40S, Sch80S Sch10,Sch20,Sch30,STD,Sch40,Sch60,XS,Sch80,Sch100,Sch120,Sch140,Sch160,XXS, |
|
Size | 1/2"-96" ? DN15-DN2400 | |
Type | Butt welded or Seamless | |
Shape | Equal or Reducing | |
Product |
1.Elbow?L/R & S/R (45/90/180 DEG) according to customer's requirement can produce the other's degree, such as 22.5 degree 30 degree 60 degree etc. |
|
2. Tee(Straight and Reducing) | ||
3. Reducer(Concentric and Eccentric) | ||
4. Cross | ||
5. Cap(Round and Elliptical) | ||
6. Stub End | ||
Quality Control | Good quality control system which covers every process of the manufacturing-Raw material inspection,cutting,bending,sizing,shot blasting,beveling,coating,marking,packing,delivery; | |
Application | Pipe fitting is the occupation of installing or repairing piping or tubing systems that convey liquid, gas, and occasionally solid materials. This work involves selecting and preparing pipe or tubing, joining it together by various means, and the location and repair of leaks. | |
Surface | Black painting ; Pickling ; Sand blasting | |
Certificate | ISO9001 ; ISO9001:2008 | |
Package | Wood case or Wooden pallets or according to the customer's requirements. | |
Features |
1) Chemical and Physical characteristic: durable, corrosion resistant and high-temperature resistant 2) We also produce pipes with special specifications according to customers' requirements; |
|
Lead Time | Within 30 days or according to the customer's requirements. | |
MOQ | 1 Piece | |
OEM | YES |