Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
TOBO GROUP
TOBO International Trading(Shanghia)Co.,Ltd Tianda Oil Pipe Co., Ltd
TOBO Pipeline Equipment Co.,Ltd TPCO & TISCO Pipe(Tianjin)Co.,Ltd.
Place of Origin: | CHINA |
---|---|
Brand Name: | TOBO |
Minimum Order Quantity: | 1pc |
Price: | USD1-30/KGS |
Packaging Details: | PLY-wooden case or pallet or as for clients' requirements |
Delivery Time: | 5-10workdays |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 300ton/month |
Grade: | Nickel Base Alloy | Ultimate Strength (≥ Mpa): | ASTM Standars |
---|---|---|---|
Application: | Industry | Type: | Nickel Pipe,Nickel Tube/pipe |
Shape: | Tube/pipe,Tube,Customized | Standard: | ASTM ASME YB HB BJB GB |
Outer Diameter: | 1mm-1500mm | Thickness: | 0.1mm-60mm |
Product Name
|
Nimonic 75A/GH3030 GH3039 GH3044 GH3625 Inconel alloy 686 nickel alloy sheet pipe
|
Material
|
Monel/Inconel/Hastelloy/Duplex Steel/PH Steel/Nickel Alloy
|
Type
|
Round bar,Forging,Ring,Coil,Flange,Disc,Foil,Spherical,Ribbon,Square,Bar,Pipe,Sheet
|
Grade
|
Duplex: 2205(UNS S31803/S32205),2507(UNS S32750),UNS S32760(Zeron 100),2304,904L
|
Others: 253Ma,254SMo,654SMo,F50(UNS S32100)F60,F61,F65,1J22,N4,N6 etc
|
|
Hastelloy: Hastelloy B/ -2/B-3/C22/C-4/S/ C276/C-2000/G-35/G-30/X/N/g;
Hastelloy B / UNS N10001,Hastelloy B-2 / UNS N10665 / DIN W. Nr. 2.4617,Hastelloy C,Hastelloy C-4 /UNS N06455 / DIN W. Nr. 2.4610,Hastelloy C-22 / UNS N06022 / DIN W. Nr. 2.4602,Hastelloy C-276 / UNS N10276 / DIN W. Nr. 2.4819,Hastelloy X / UNS N06002 / DIN W. Nr. 2.4665 |
|
Inconel:Inconel 600/601/602CA/617/625/713/718/738/X-750,Carpenter 20;
Inconel 718 / UNS N07718 / DIN W. Nr. 2.4668,Inconel 601 / UNS N06601 / DIN W. Nr. 2.4851,
Inconel 625 / UNS N06625 / DIN W. Nr. 2.4856,Inconel 725 / UNS N07725,Inconel X-750 / UNS N07750 / DIN W. Nr. 2.4669,Inconel 600 / UNS N06600 / DIN W. Nr. 2.4816 |
|
Incoloy: Incoloy 800/800H/800HT/825/925/926;
|
|
GH: GH2132,GH3030,GH3039,GH3128,GH4180,GH3044
|
|
Monel: Monel 400/K500/R405
|
|
Nitronic: Nitronic 40/50/60;
|
|
Nimonic: Nimonic 75/80A/90/A263 ;
|
|
|
Bar: φ4-50mm;Length 2000-5000mm
Pipe: φ6-273mm;δ1-30mm;Length 1000-8000mm Sheet: δ 0.8-36mm;Width 650-2000mm;Length 800-4500mm Wire: 0.01-10mm
Strip: 0.05*5.0-5.0*250mm |
Characteristics
|
1.According to the preparation process can be divided into deformation superalloys,
casting superalloys and powder metallurgy superalloys. 2.According to the strengthening mode, there are solid solution strengthening type, precipitation strengthening type, oxide dispersion strengthening type and fiber strengthening type, etc.. |
Standard
|
GB,AISI,ASTM,DIN,EN,SUS,UNS etc
|
Inspection
|
ISO,SGS,BV and so on
|
Application
|
High temperature components such as turbine blades, guide vanes, turbine disks, high pressure
compressor disks,machine manufacturing and combustion chambers used in the manufacture of aviation, naval and industrial gas turbines |
More than 120 top-class mills
A number of advanced equipments
Company with a variety of detection devices
We have five branch factories
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.
We are manufacturer ,You can see the Alibaba certification.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.