Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
| Place of Origin: | China |
|---|---|
| Brand Name: | TOBO |
| Certification: | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
| Model Number: | Reducer |
| Minimum Order Quantity: | 100KGS |
| Price: | Negotiable |
| Packaging Details: | in plastic bags then in bundles |
| Delivery Time: | 15-20 days |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 1500 tons per month |
| Standard: | ASME B16.9 | Color: | Black,white |
|---|---|---|---|
| Material: | ASTM B861,Titanium Alloy | Type: | Reducer |
| Highlight: | Titanium Alloy Swage Nipple Fitting,Forged Pipe Swage Nipple Fitting |
||
Titanium Alloy Swage Nipple ASTM B861 GR2 2'' x 1'' SCH10S x SCH40S Forged Pipe Fittings
| Quantity(pieces) | 1 - 10 | 11 - 100 | 101 - 1000 | >1000 |
| Est. Time(days) | 7 | 10 | 15 | To be negotiated |
| Main Production Name | Concentric /Eccentric Reducers/ Swage Nipple |
| Size Range | From ½” up to 48 ” |
| Schedule | SCH STD, XS, XXS, SCH 10 ~ SCH 160 |
| Main Material Code: | |
| Carbon Steel | ASTM A234 WPB, WPC; ASTM A420 WPL9, WPL3, WPL6, WPHY-42 |
| WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70, | |
| Alloy Steel | ASTM A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 |
| Nickel alloy steel | Inconel 600, Inconel 625, Inconel 718, Inconel X750, Incoloy 800, |
| Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K500 | |
| Stainless Steel | ASTM A403 WP304/304L, WP316/316L, WP321, WP347, WPS 31254 |
|
Duplex stainless steel |
ASTM A 815 UNS S31803, UNS S32750, UNS S32760 |
| Standard | ANSI, ISO, JIS, DIN, BS,GB, SH, HG,QOST,ETC. |
| Certification: | ISO9001:2000 , API , BV , , LOIYD |
|
Applications range: |
Petroleum, chemical, power, gas, metallurgy, shipbuilding.construction,water and nuclear power etc. |
| Quality | High lever |
|
The third party inspection: |
BV,,LOIYD,TUV,and other party alloyed by clients. |
| Delivery Time: | At the earliest ,within the period required by customer. |
| Remark: |
Also can supply IBR fittings and Specialized NACE & HIC Fittings |
![]()
![]()





Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

We are manufacturer ,You can see the Alibaba certification.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.