Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
| Place of Origin: | China/Japan/Germany |
|---|---|
| Brand Name: | TOBO |
| Certification: | ISO/PED/TUV/SGS/LR/BV |
| Model Number: | Seamless Pipe |
| Minimum Order Quantity: | 0.5-1tons |
| Price: | negotiable |
| Packaging Details: | in plastic bags then in bundles |
| Delivery Time: | 15days-> |
| Payment Terms: | T/T,L/C,Western Union,MoneyGram |
| Supply Ability: | 7500 tons per year |
| Standard: | DIN,ANSI,ISO,GB,JIS | Application: | Fluid Pipe,Structure Pipe |
|---|---|---|---|
| Surface: | Annealed& Picked,Bright Annealing,Polished | Types: | Seamless |
| Thickness: | 0.5-100mm | Outer Diame: | 6-813mm |
| Material: | Alloy Steel,Brass,copper | Sample: | Provided,Free,Available Free Within 7days |
| Highlight: | thick wall copper nickel tube,seamless copper brass tube ASTM B111,large diameter copper nickel tube |
||
Cuzn40 / C28000 Thick Wall Diameter ASTM B111 Big Seamless Copper Brass Tube
|
Type
|
Straight Copper Pipe
|
|
Standard
|
AiSi, ASTM, bs, DIN, GB, JIS, etc
|
|
Certificate
|
ce,ISO9001,etc
|
|
Length
|
1-12m,According to customer needs
|
|
Wall Thickness
|
0.3mm~80mm,According to customer needs
|
|
Outside Diameter
|
2mm~610mm,According to customer needs
|
|
Material
|
C1220,C12000,C10200,T1,T2,T3,TP2,TU1,TU2,TU etc
|
|
Temper
|
soft (M), half soft (M2) and half hard (Y2)
|
|
Ultimate Strength (≥ MPa):
|
205-245
|
|
Elongation (≥ %)
|
40%
|
|
Alloy Or Not
|
Non-Alloy
|
|
Model Number
|
TP2/C11000/C12200 etc
|
|
Processing Service
|
Bending, Decoiling, Welding, Punching, Cutting
|
|
Grade:
|
TP2/C11000/C12200 etc
|
|
Sample
|
Available
|
|
MOQ
|
200 KG
|
|
Payment Term
|
T/T,D/P,L/C,/D/A/,Western Union,MoneyGram,according to customer
|
|
Delivery Time
|
within 7 days,according to the quantity ordered by the customer
|
| Quantity(tons) | 1 - 50 | 51 - 100 | 101 - 200 | >200 |
| Lead time (days) | 5 | 10 | 15 | To be negotiated |






FAQ
Q1:Can we visit your factory ?