All Products
-
Butt Weld Fittings
-
Stainless Steel Elbow
-
Stainless Steel Tee
-
Stainless Steel Reducer
-
Stainless Steel Pipe Cap
-
Duplex Stainless Steel Pipe
-
Stainless Steel Stub Ends
-
Forged Pipe Fittings
-
Forged Steel Flanges
-
API Carbon Steel Pipe
-
Stainless Steel Seamless Pipe
-
Stainless Steel Welded Pipe
-
Nickel Alloy Pipe
-
Hastelloy Pipe
-
Copper Nickel Tube
-
Stainless Steel Plate
-
Stainless Steel Bars
-
Spiral Wound Gasket
-
Cast Acrylic Sheet
-
Brazil---AimeeIn the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate. -
Thailand ---Dave MulroyASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner . -
USA ---AlfaroASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
304/316 Female Hydraulic Transition Pipe Fittings Stainless Steel Connector Tee
Product Details
| Warranty | 6 Months | Place Of Origin | Shanghai, China |
|---|---|---|---|
| Model Number | Tee | Connection | Female |
| Head Code | Round | Suitable Medium | Water/Oil/Gas |
| Standard | Stainless Steel Jic Fittings | Packing | Carton Box |
| Highlight | 304 stainless steel hydraulic tee,female hydraulic pipe connector,316 stainless steel transition fitting |
||
Product Description
304/316 Female Hydraulic Transition Pipe Fittings Stainless Steel Connector Tee
Overview
Essential details
- Warranty:
-
6 months
- Customized support:
-
OEM
- Place of Origin:
-
Shanghai, China
- Brand Name:
-
TOBO
- Model Number:
-
Tee
- Technics:
-
Forged
- Connection:
-
Female
- Shape:
-
Equal
- Head Code:
-
Round
- Item Name:
-
Stainless steel tee pipe fittings
- Suitable Medium:
-
Water/Oil/Gas
- Material:
-
stainless steel
- Standard:
-
stainless steel jic fittings
- Thread:
-
Female Thread
- Packing:
-
Carton Box
- Delivery time:
-
7-15 Days
Supply Ability
- Supply Ability
- 500 Piece/Pieces per Week
Packaging & delivery
- Packaging Details
- standard packing for Stainless steel tee
- Port
- Shanghai
- Picture Example:
-


- Lead time:
-
Quantity(pieces) 1 - 1000 >1000 Lead time (days) 15 To be negotiated -
Packing & Delivery






FAQ1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the Alibaba certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
3.Where is your factory located? How can I visit there?
We locate in Daqiuzhuang Town, Jinghai District, Tianjin, China, 30 minutes from Beijing by train.
4. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
5. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Recommended Products








