Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
TOBO GROUP
TOBO International Trading(Shanghia)Co.,Ltd Tianda Oil Pipe Co., Ltd
TOBO Pipeline Equipment Co.,Ltd TPCO & TISCO Pipe(Tianjin)Co.,Ltd.
Place of Origin: | Shanghai, China (Mainland) |
---|---|
Brand Name: | TOBO |
Certification: | ISO 9001:2000 |
Model Number: | TOBO7487323 |
Minimum Order Quantity: | 1PCS |
Price: | Negotation |
Packaging Details: | wooden case |
Delivery Time: | 7~15days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 30000 Piece/Pieces per Month |
Product Name: | 1/2"-48" ASTM ALLOY STEEL ELBOW(12Cr1MoV,P11,P22,P91,WB36,etc | Material: | Alloy |
---|---|---|---|
Size: | 1/2"-48" | Shape: | Equal |
Standard: | ASTM | Connection: | Welding |
Head Code: | Round | ||
Highlight: | butt welded pipe fittings,butt weld tube fittings |
Products | Elbows |
Material | ASTM A234WP11 WP22 WP5 WP91 12Cr1MoVG SA106Gr.B SA106Gr.C,Q345B Q345D |
Standard | ASTM JIS DIN GB |
Size | 1/2″-26″ |
Wall thickness | SCH20-SCH160 |
surface treatment | Transparent oil, or black oil or blue oil |
Application | Natural gas, petroleum, chemical industry, electric power, metallurgy thermodynamic fields, water supply engineering, steam heating, hydroelectric power station and long pipe line transportation projects. |
Packaging | Wooden Cases or wooden pallet bundle packing, paint on the pipe, plastic covers at the ends or as per customer requirement. |
Min Order Quantity | 20 Metric Ton If less than 20 tons can be solved by our communication |
Port | TianJin XinGang Port |
Delivery Time | According to customer’s requirements or normal delivery |
Authentification code | ISO 9001:2000 |
Brand Name | TOBO |
Product Name | Hot rolled ASTM A335 T91 alloy seamless elbow |
Item | Alloy steel elbow |
Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
Place of Origin | Shanghai China (Mainland) |
Size | DN15-DN1200 / 1-48 inch |
Material | Carbon steel(ASTM A105,A350LF2,A350LF3,) |
Stainless steel(ASTM A182 F304, F304L,F316,F316L,F321, F347,F310F44F51,A276 S31803, A182, |
|
F43, A276 S32750,A705 631,632,A961, A484, | |
T91 (P91) | |
F12,F11,F22,F5,F9,F91,F1ECT) | |
Standard | DIN,EN,ASTM,BS,JIS,GB,ASME(ASME16.9/16.20) |
Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
Minimum Order Quantity | 1pcs |
Price | Depending on quantity |
Payment Terms | T/T or Western Union or LC |
Supply Ability | 30tons per month |
Delivery Time | 10-50 days depending on quantity |
Packaging Details | PLY-WOODEN CASE |
We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories.
More than 120 top-class mills
A number of advanced equipments
Company with a variety of detection devices
We have five branch factories
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.
We are manufacturer ,You can see the Alibaba certification.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.