• TOBO STEEL GROUP CHINA
    Brazil---Aimee
    In the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate.
  • TOBO STEEL GROUP CHINA
    Thailand ---Dave Mulroy
    ASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner .
  • TOBO STEEL GROUP CHINA
    USA ---Alfaro
    ASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
Contact Person : Joy Wang
Phone Number : 0086-21-31261985
WhatsApp : +8613524668060

DN15-DN2400 Stainless Steel Seamless Pipe A312 TP316 4" Sch40 Tube / Pipe

Place of Origin China
Brand Name TOBO
Certification SGS/BV/ISO
Model Number TOBO4545
Minimum Order Quantity 500kg
Price Negotation
Packaging Details Ply-wooden case
Delivery Time 20 work day
Payment Terms L/C, D/A, D/P, T/T, Western Union,
Supply Ability 300Ton/month
Product Details
Name Stainless Steel Seamless Pipe A312 TP316 4" Sch40 Tube/Pipe Application Petroleum/Power/Chemical
Color Silver Elbow Certificate SGS
Product Name 316l Stainless Steel Tube Usage Oil Gas Water Industrial
Standard ASTM A312 Size DN15-DN2400
Surface Treatment Polish
Highlight

marine stainless steel tubing

,

stainless steel round tube

Leave a Message
Product Description
Product Description

DN15-DN2400 Stainless Steel Seamless Pipe A312 TP316 4" Sch40 Tube/Pipe

 

Product Name

TOBO Pipe

Material

Stainless Steel

Pipe Length

Single Random Length and double Random Length.

SRL:3M-5.8M DRL:10-11.8M or As clients requested length

Size

Size 1/4" to 24" Outside Diameter 13.7 mm to 609.6 mm

Wall thickness

SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS

Standard

ASTM B165 , ASTM B163 , ASTM B829 , ASTM B775 ,ASTM B725 ,ASTM B730 , ASTM B751

ASTM B 444,  ASME SB444,

Applications field

The elevated temperature strength, excellent corrosion resistance and work ability at 700℃ properties made it use in a wide range of high requirement environments.
1.Steam turbine
2.Liquid-fuel rocket
3.Cryogenic engineering
4.Acid environment
5.Nuclear engineering

Chemical composition

Ni: 50~55% ;  Cr:17~21% ;  Fe: balance;Mo:2.8~3.3% ; Nb: 4.75~5.5% ; Co: ≤1.0% ; C≤0.08% ;   Mn≤0.35% ;  Si≤ 0.35% ;  Cu≤0.3% ; Al: 0.2~0.8% ;  Ti: 0.65~1.15% ; P≤0.015% ; 

Certificate

ISO/PED/TUV/SGS/LR/BV

Main Market

Asia, Middle East, Europe, America, Africa, Australia, etc

 

 

 
 
 
70

.jpg2 (2).jpg03.jpg

Company Information
21384294823.jpg

ABOUT US

 We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories.

VIEW MORE>>
Product testing
,1.jpg
Process flow
3.jpg
 
Certification

2.jpg

Our Advantages
4.jpg

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1.  Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

 Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 
Packaging&Shipping

Package:Standard export carton packing.

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

3412421.jpg

Contact us

P[ZBF`KOZ%{}_O}OI[(CBVJ.jpg