All Products
-
Butt Weld Fittings
-
Stainless Steel Elbow
-
Stainless Steel Tee
-
Stainless Steel Reducer
-
Stainless Steel Pipe Cap
-
Duplex Stainless Steel Pipe
-
Stainless Steel Stub Ends
-
Forged Pipe Fittings
-
Forged Steel Flanges
-
API Carbon Steel Pipe
-
Stainless Steel Seamless Pipe
-
Stainless Steel Welded Pipe
-
Nickel Alloy Pipe
-
Hastelloy Pipe
-
Copper Nickel Tube
-
Stainless Steel Plate
-
Stainless Steel Bars
-
Spiral Wound Gasket
-
Cast Acrylic Sheet
-
Brazil---AimeeIn the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate. -
Thailand ---Dave MulroyASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner . -
USA ---AlfaroASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
Incoloy 825 alloy carbon steel 90D LR/SR elbow U bend 180 elbow 90 degree bends
Product Details
| Material | Alloy | Shape | Equal,Equal & Reducing |
|---|---|---|---|
| Connection | Welding,butt Welded | Technics | Forged |
| Head Code | Round | Type | Elbow |
| Size | Customized Size | Application | Industry,gas And Oil Pipes |
| Standard | ANSI,DIN,BS,ASME B16.9,GB | Packing | Wooden Case,In Wooden Cases Or Pallets |
| Usage | Pipe-line Connection | ||
| Highlight | Chemical Butt Weld Fittings,NPT Butt Weld Fittings,ASTM Butt Weld Fittings |
||
Product Description
Incoloy 825 Steel Pipe Elbows (YZF-E169)
| Material | alloy steel, stainless steel, carbon steel |
| Type | 45 DEG, 90DEG, 180 DEG |
| Standard | UNS N08825, DIN/EN 2.4858, ASTM B424, ASME SB-424, JIS NCF825, NAS 825 |
| Size | 1/2' ' ~48' ' (Seamless); 16' ' ~72' ' (Welded) |
| Wall Thickness | Sch5-Sch160, STD, XS, XXS |
| Nickel content | incoloy 825: 30-46%, incoloy 800H: 30-35%, incoloy 901: 40-45%, incoloy 718: 50-55% |
| Technology | Welding, pushing |
| Finish | shot blasted, rust-proof oil |
| Marking | standard or as customer' s need |
| Inspection | in-house or the third party |
| Application | Petroleum, chemical, power, gas, metallurgy, shipbuilding construction. |
| Delivery Time | usually within 25-30 days after we have confirmed your order |
| MOQ | 10 piece |
| Packing | wooden cases or pallets or as per requirement |
| Productivity | 300000 Tons per year |
![]()
![]()
![]()
![]()
![]()
Related Products
Our Advantages
FAQ
Packaging&Shipping
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.
Recommended Products

