• TOBO STEEL GROUP CHINA
    Brazil---Aimee
    In the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate.
  • TOBO STEEL GROUP CHINA
    Thailand ---Dave Mulroy
    ASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner .
  • TOBO STEEL GROUP CHINA
    USA ---Alfaro
    ASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
Contact Person : Joy Wang
Phone Number : 0086-21-31261985
WhatsApp : +8613524668060

Incoloy 800 800H elbow Pipe Fitting Alloy 800 800H UNS08800 MSS-SP75 Elbow

Place of Origin CHINA
Brand Name TOBO
Certification ISO
Minimum Order Quantity 10PCS
Price USD10-50/PC
Packaging Details PLY-wooden case or pallet or as for clients' requirements
Delivery Time 5-10workdays
Payment Terms T/T, Western Union
Supply Ability 300ton/month
Product Details
Material Alloy Shape Equal,Customer's Request
Connection Welding,butt Welded Technics Forged
Head Code Round,Square Type Elbow
Size Customized Size Application Industry,gas And Oil Pipes
Standard ANSI,DIN,BS,ASME B16.9,GB Packing Wooden Case,In Wooden Cases Or Pallets
Usage Pipe-line Connection
Highlight

Chemical Butt Weld Fittings

,

NPT Butt Weld Fittings

,

ASTM Butt Weld Fittings

Leave a Message
Product Description
Product Name
High strength Standard weight Aisi Incoloy 800 alloy steel LR bw 90D elbow price
 
Material
Stainless Steel: ASTM A403 WP304, 304L, 310, 316, 316L, 321, 347, 904L
Alloy Steel: ASTM A234 WP1, WP5, WP9, WP11, WP22, WP91 Low. S31803.S32750 Temperature: ASTM A420 WPL 1, WPL 3, WPL 6
Size
Seamless 1/2" To 24" Welded To 72" Wall thickness: SCH5S-Sch160, XS,XXS
Standard
DIN GB ISO JIS BA ANSI
Surface treatment
Sand Rolling, Sand Blasting ,Acid Cleaning.
Applications
Petroleum,chemical,power,gas,metallurgy, shipbuilding, construction, etc
Certificate
API, CCS,and ISO9001:2008
Delivery time
7days-15days after receipt of advanced payment
Productivity
10000 ton per year

Incoloy 800 has good rupture and creep strength and excellent resistance to oxidation, carburization and sulfidation at temperatures up to 816℃. It also resists general corrosion by many aqueous media. For Applications requiring higher stress rupture and creep properties, especially at temperatures above 816℃, Incoloy 800H and 800HT are recommended. Incoloy 800 is readily formed, welded and machined.

 

The Chemical Composition of Incoloy 800, %
Ni 30.0-35.0
Cr 19.0-23.0
Fe ≥39.5
Ti 0.15-0.60
Al 0.15-0.60
C ≤0.10
Mn ≤1.50
Si ≤1.00
S ≤0.015
Cu ≤0.75

 

Incoloy 800 800H elbow Pipe Fitting Alloy 800 800H UNS08800 MSS-SP75 ElbowIncoloy 800 800H elbow Pipe Fitting Alloy 800 800H UNS08800 MSS-SP75 ElbowIncoloy 800 800H elbow Pipe Fitting Alloy 800 800H UNS08800 MSS-SP75 ElbowIncoloy 800 800H elbow Pipe Fitting Alloy 800 800H UNS08800 MSS-SP75 Elbow
Incoloy 800 800H elbow Pipe Fitting Alloy 800 800H UNS08800 MSS-SP75 Elbow
 
Our Advantages

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1. Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 
Packaging&Shipping

Package:Standard export carton packing.

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.