-
Butt Weld Fittings
-
Stainless Steel Elbow
-
Stainless Steel Tee
-
Stainless Steel Reducer
-
Stainless Steel Pipe Cap
-
Duplex Stainless Steel Pipe
-
Stainless Steel Stub Ends
-
Forged Pipe Fittings
-
Forged Steel Flanges
-
API Carbon Steel Pipe
-
Stainless Steel Seamless Pipe
-
Stainless Steel Welded Pipe
-
Nickel Alloy Pipe
-
Hastelloy Pipe
-
Copper Nickel Tube
-
Stainless Steel Plate
-
Stainless Steel Bars
-
Spiral Wound Gasket
-
Cast Acrylic Sheet
-
Brazil---AimeeIn the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate. -
Thailand ---Dave MulroyASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner . -
USA ---AlfaroASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
Customized 5D Long Radius SCH40 Black Carbon Steel Bend Pipe Elbow
| Place of Origin | China |
|---|---|
| Brand Name | TOBO |
| Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
| Model Number | Elbow |
| Minimum Order Quantity | Negotiable |
| Price | Negotiable |
| Packaging Details | STANDARD PLY-WOODEN CASE OR AS YOUR REQUEST |
| Delivery Time | 10-100 days depending on quantity |
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 3,0000pcs per month |
| Material | Carbon Steel | Technics | Forged/casting |
|---|---|---|---|
| Type | Seamless Or Weld | Item Shape | 90 Degree Elbow |
| Keyword | Casting Connector Long Radius Elbow | Connect Way | Weld /Thread /Socket |
| Process | Forging+machining+heating Treatment | Connector Type | Elbow |
| Usage | Oil Gas Water Industrial | Packing | Plywood Case Or Pallet |
| Highlight | 5D Long Radius Bend Pipe Elbow,SCH40 Seamless Bend Pipe Elbow,72" Welded Bend Pipe Elbow |
||
ASME WPB A234 Carbon Steel Welding Pipe Connector Long Radius Elbow
Product Decription:
The elbows includes grooved elbows, bite type elbow, butt welding elbow, socket welding elbow. A butt weld pipe fitting is
designed to be welded on site at its ends to connect pipes together and allow change in direction,branching or ending. A butt
weld pipe fitting is designed to be welded on site at its ends to connect pipes together and allow change in direction, branching
or ending. The center to face distance for a "long" radius elbow, abbreviated LR always is "1½ x Nominal Pipe Size (NPS)
(1½D)", while the center to face distance for a "short" radius elbow, abbreviated SR even is to nominal pipe size. abbreviated
SR even is to nominal pipe size.
| Size | 1/2’’~10’’(Seamless);12’’~72’’(Welded) |
| Thickness | Sch5S~Sch160XXS |
| Material | Carbon Steel,Stainless Steel,Nickel alloy steel |
| Package | Wooden cases, pallets, nylon bags or according to the customers' requirements |
| Delivery time | 10-100 days depending on quantity |
| Payment terms | T/T or Western Union or LC |
| Shipment | FCA Tianjin/Shanghai, CFR, CIF, etc |
| Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
| Remarks | Other materials and drawings are available. |
Detailed Images:
Elbows are split into two groups which define the distance over which they change direction; the center line
of one end to the opposite face. This is known as the "center to face" distance and is equivalent to the radius
through which the elbow is bent.
![]()
Packing & shipping:
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and
order quantity.
![]()
Advantages:
1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products EXPORT to Africa, Oceania, mid east, eastern Asia, Western Europe etc.
FAQ:
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the Alibaba certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

