Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
| Place of Origin: | China/Japan/Germany |
|---|---|
| Brand Name: | TOBO/TPCO/TISCO/VALIN/METAL |
| Certification: | ISO/PED/TUV/SGS/LR/BV |
| Model Number: | 1.4835 Stainless Steel Seamless Pipe |
| Minimum Order Quantity: | 0.5-1 tons |
| Price: | negotiable |
| Packaging Details: | in plastic bags then in bundles |
| Delivery Time: | 15days-> |
| Payment Terms: | T/T, L/C, Western Union, MoneyGram |
| Supply Ability: | 7500 tons per year |
| Standard:: | DIN, ANSI, ISO, GB, JIS | Application: | Fluid Pipe,Structure Pipe |
|---|---|---|---|
| Surface: | Annealed & Pickled, Bright Annealing, Polished | Types:: | Seamless |
| Thickness: | 0.5-100mm | Outer Diameter: | 6-813mm |
| Material: | Carbon Steel,Stainless Steel,alloy Steel,Brass,copper | Sample: | Provided,Free,Available Free Within 7days |
| Highlight: | Carbon Steel Socket Weld Flange,Seamless Carbon Steel Flanges,Bright Annealing Socket Weld Flange |
||
| Quantity(pieces) | 1 - 10000 | >10000 |
| Est. Time(days) | 10 | To be negotiated |
|
Material
|
Carbon steel, stainless steel, alloy steel, aluminum, copper, etc.
|
|
Surface treatment
|
Plating(zinc,nickel,chrome), electrophoresis, painting, powder coating,electrostatic spraying, hot dip galvanized, polishing
|
|
Size or shape
|
According to customer drawing or sample
|
|
Range of Material Thickness
|
It is 0.2-10mm for punching, stamping, forming, and no thickness limit for welding.
|
|
Processing Range
|
Sheet Metal Fabrication,CNC Machining Laser Cutting, Stamping, Deep Drawing, Bending, Punching, Welding
|
|
Service mode
|
OEM or ODM
|
|
Certification
|
ISO9001:2008, TS16949, EN 15085, quality management system
|
|
Feature
|
Focus on high end market products
|
|
Market
|
All over the world
|










|
Packing Method
|
Cartons and fumigation-free wooden box
|
|
Transportation Mode
|
Vessels
|
|
Loading Port
|
China Seaports
|
|
Delivery Term
|
Generally speaking, we finish the molds within 30 to 45 days and deliver bulk production within 25 to 35 days
|