All Products
-
Butt Weld Fittings
-
Stainless Steel Elbow
-
Stainless Steel Tee
-
Stainless Steel Reducer
-
Stainless Steel Pipe Cap
-
Duplex Stainless Steel Pipe
-
Stainless Steel Stub Ends
-
Forged Pipe Fittings
-
Forged Steel Flanges
-
API Carbon Steel Pipe
-
Stainless Steel Seamless Pipe
-
Stainless Steel Welded Pipe
-
Nickel Alloy Pipe
-
Hastelloy Pipe
-
Copper Nickel Tube
-
Stainless Steel Plate
-
Stainless Steel Bars
-
Spiral Wound Gasket
-
Cast Acrylic Sheet
-
Brazil---AimeeIn the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate. -
Thailand ---Dave MulroyASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner . -
USA ---AlfaroASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
ASTM A312 UNS S31254 1-1/2'' SCH40 Pipe Fittings Tee Duplex Stainless Steel Equal / Reducing Tee
Product Details
| Material | Alloy | Shape | Equal,Customer's Request |
|---|---|---|---|
| Connection | Butt Welded | Head Code | Round,Square,Equal |
| Type | Tee | Size | Customized Size |
| Application | Industry,gas And Oil Pipes | Standard | ANSI,DIN,BS,ASME B16.9,GB |
| Packing | Wooden Case,In Wooden Cases Or Pallets,or As Per Clients' Requirements | Color | White,Can Be Customed |
| Usage | Pipe-line Connection | ||
| Highlight | ASTM A312 stainless steel pipe fittings,Duplex stainless steel reducing tee,Butt weld fittings with SCH40 |
||
Product Description
ASTM A312 UNS S31254 1-1/2'' SCH40 Pipe Fittings Tee Duplex Stainless Steel Equal / Reducing Tee
Product Description
Details Images
FEATURES
Alloy 926 is a super austenitic stainless steel having excellent resistance to pitting and crevice corrosion in media containing haildes and hydrogen sulfide. It also has outstanding resistance to chloride-induced stress corrosion cracking, and resists to both oxidizing and reducing environments.
APPLICATIONS
Sour (containing hydrogen sulfide) crude oil and natural gas well components, flue gas desulfuruzation system components, marine engineering piping, and corrosive chemicals containers.
Recommend Products
FAQ
FAQ
Q 1. What's the payment term?A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.
Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.
Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.
Q 5. what kind of certificates you have?
A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS since 2005.
A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.
Recommended Products

