-
Butt Weld Fittings
-
Stainless Steel Elbow
-
Stainless Steel Tee
-
Stainless Steel Reducer
-
Stainless Steel Pipe Cap
-
Duplex Stainless Steel Pipe
-
Stainless Steel Stub Ends
-
Forged Pipe Fittings
-
Forged Steel Flanges
-
API Carbon Steel Pipe
-
Stainless Steel Seamless Pipe
-
Stainless Steel Welded Pipe
-
Nickel Alloy Pipe
-
Hastelloy Pipe
-
Copper Nickel Tube
-
Stainless Steel Plate
-
Stainless Steel Bars
-
Spiral Wound Gasket
-
Cast Acrylic Sheet
-
Brazil---AimeeIn the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate. -
Thailand ---Dave MulroyASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner . -
USA ---AlfaroASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
Stainless Steel Reducer Tee Elbow SMLS 1-24" 2507 32750 Butt Welding Fittings Super Duplex
| Material | Duplex Stainless Steel 32750 | Shape | Equal,Customer's Request |
|---|---|---|---|
| Connection | Butt Welded | Head Code | Round,Square,Equal |
| Size | Customized Size | Application | Industry,gas And Oil Pipes |
| Standard | ANSI,DIN,BS,ASME B16.9,GB | Packing | Wooden Case,In Wooden Cases Or Pallets,or As Per Clients' Requirements |
| Color | White,Can Be Customed | Usage | Pipe-line Connection |
| Highlight | Stainless Steel Reducer Tee Elbow,SMLS Tee Elbow,Butt Welding Reducer Elbow |
||
2507 is a duplex stainless steel with nearly equal proportions of austenite and ferrite when properly heat treated. This microstructure makes it much more resistant to stress corrosion cracking than stainless steel 304 and 316L. 2205’s higher chromium, molybdenum and nitrogen contents give it sihnificantly improved pitting and crevice corrosion resistance in the presence of chlorides. Its yield strength is about twice that of austenitic stainless steels. It is highly suitable for applications in environments containing chlorides and hydrogen sulfide such as marine applications and oil and gas production.
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.
Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.
Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.
Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.
Q 5. what kind of certificates you have?
A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS since 2005.
A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.

