All Products
-
Butt Weld Fittings
-
Stainless Steel Elbow
-
Stainless Steel Tee
-
Stainless Steel Reducer
-
Stainless Steel Pipe Cap
-
Duplex Stainless Steel Pipe
-
Stainless Steel Stub Ends
-
Forged Pipe Fittings
-
Forged Steel Flanges
-
API Carbon Steel Pipe
-
Stainless Steel Seamless Pipe
-
Stainless Steel Welded Pipe
-
Nickel Alloy Pipe
-
Hastelloy Pipe
-
Copper Nickel Tube
-
Stainless Steel Plate
-
Stainless Steel Bars
-
Spiral Wound Gasket
-
Cast Acrylic Sheet
-
Brazil---AimeeIn the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate. -
Thailand ---Dave MulroyASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner . -
USA ---AlfaroASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
ASME B16.9 A234 Wpb Seamless Butt Weld Carbon Steel Pipe Fittings Eccentric Reducer
Product Details
| Material | Carbon Steel | Shape | ROUND |
|---|---|---|---|
| Connection | Welding | Technics | Cold Press |
| Type | Reducer | Size | Customized Size |
| Standard | ASME | Application | Connect Pipes |
| Color | Silver | Place Of Origin | China |
| Highlight | ASME B16.9 carbon steel pipe fittings,seamless butt weld eccentric reducer,A234 Wpb butt weld fittings |
||
Product Description
ASME B16.9 A234 Wpb Seamless Butt Weld Carbon Steel Pipe Fittings Eccentric Reducer
Overview
Specification
| Product Name | Eccentric Butt Weld Reducer |
| Size | 1/2"-96" |
| Standard | ANSI B16.9, EN10253-2, DIN2605, GOST17375-2001, JIS B2313, MSS SP 75, |
| Wall thickness | SCH10,SCH20,SCH30,SCH40, SCH60, SCH80, SCH160, XXS |
| Material | Carbon steel: A234WPB, A420 WPL6 St37,St45, E24, A42CP, 16Mn, Q345, P245GH,P235GH, P265GH, P280GH, P295GH, P355GH etc. |
| Pipeline steel: ASTM 860 WPHY42, WPHY52, WPHY60, WPHY65,WPHY70, WPHY80 and etc. | |
| Alloy steel: A234 WP11,WP22,WP5,WP9,WP91, 10CrMo9-10, 16Mo3 etc. | |
| Application | Chemical , power, construction, potroleum, gas, water, steam, |
| Customized Size | Available |
| Special Design | Available |
| Delievery Time | 7-45 days upon order quantity |
|
Advantages |
1. Customerized dimensions to meet different requirement |
| 2. quality control from raw materials to the final products | |
| 3. Abundant stock | |
| 4.Rich export experience | |
| 5. Reliable shipping forwarder |
Key attributes
Industry-specific attributes
Technics
Forged
Shape
Round
Head Code
Round
Other attributes
Place of Origin
Shanghai, China
Warranty
1 year
Customized support
OEM, ODM
Model Number
Eccentric Butt Weld Reducer
Connection
Welding
Application
Oil, Gas, Water, Chemical
Material
Stainless Steel/Carbon Steel/Alloy
Size
1/2"-90"
Standard
ANSI B16.9, EN10253-2, DIN2605, GOST17375-2001, JIS B2313, MSS SP 75
Delivery time
20-35 days
Certification
ISO 9001
Wall Thickness
SCH10,SCH20,SCH30,SCH40, SCH60, SCH80, SCH160, XXS
Temperature
-196°C-870°C
MOQ
20pcs
Packing
Wooden Box
Lead time
| Quantity (pieces) | 1 - 100 | > 100 |
| Lead time (days) | 35 | To be negotiated |
Product Description







Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
FAQ
Q1:What product information must I provide before making a purchase?
Please provide the grade, width, thickness, and surfacetreatment requirements, as well as the quantities you require.
Q2:What shipping ports are there?
We normally ship from Shanghai,Tianjin, Qingdao, and Ningbo ports
Q3:What are your payment terms?
30% T/T in advance and 70% balance before shipment or based onBL copy or LC at sight. Q4:What about product pricing information?
Prices vary due to changes in raw material prices on a regular basis.
Q5:Is it possible to send samples?
Of course, we offer free samples and express shipping to customers all over the world.
Q6:Do you offer a service for customized products?
Q6:Do you offer a service for customized products?
Yes, we can produce according to your specifications and drawings.
Q7:Can I pay you a visit at your factory?
Customers from all around the world are welcome to visit our factory.
Q8:Can you assist me in importing steel products for the first time?
Yes, we have shipping agent who will arrange the shipment with you.
Q9. What is your delivery time?
Within 7 working days after receiving your balance payment.
Recommended Products






