• TOBO STEEL GROUP CHINA
    Brazil---Aimee
    In the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate.
  • TOBO STEEL GROUP CHINA
    Thailand ---Dave Mulroy
    ASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner .
  • TOBO STEEL GROUP CHINA
    USA ---Alfaro
    ASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
Contact Person : Joy Wang
Phone Number : 0086-21-31261985
WhatsApp : +8613524668060

Butt-welding Pipe Fittings Short Type Stub End CuNi9010 1" SCH10 ASME B16.9

Place of Origin Shanghai,China
Brand Name TOBO
Certification ISO/TUV/SGS
Model Number Butt Welding Fitting
Minimum Order Quantity 1PC
Price Negotiable
Packaging Details Standard Shipping Package
Delivery Time 15-30 Workdays
Payment Terms T/T,Western Union
Supply Ability 10Ton/Month
Product Details
Standard ANSI/ASTM B16.9 Manufacturingprocess Forging, Machining, Heat Treatment
Customized Support OEM, ODM, OBM Payment T/T, Paypal, Alipay
Warranty 1 Year Production Year Butt Welding Fittings
Wallthickness Schedule 10 To Schedule 160 Surfacefinish Polished, Painted, Galvanized
Leave a Message
Product Description

Butt-welding Pipe Fittings Short Type Stub End CuNi9010 1" SCH10 ASME B16.9

1. Product Description

This product is a butt-welding short type stub end, manufactured from CuNi 90/10 (Copper-Nickel 90/10, UNS C70600) in accordance with ASME B16.9 and MSS SP-43 standards . Also known as CuNi10Fe1.6Mn, this alloy consists of approximately 90% copper and 10% nickel with small but important additions of iron and manganese to enhance overall strength and corrosion resistance . A stub end is a short pipe fitting used in conjunction with a lap joint flange to create a bolted, detachable connection . The short type features a shorter length (F dimension) compared to the long type, suitable for applications where space is limited . The 1" Schedule 10 fitting has a beveled end for butt-welding to the pipe, and a flared/lapped face for sealing against the flange.

2. Key Product Parameters



Parameter Details / Range
Dimensional Standard ASME B16.9, MSS SP-43 
Material Standard ASTM B466 / ASME SB466 (UNS C70600) 
Material Grade CuNi 90/10 (UNS C70600 / CuNi10Fe1.6Mn) 
Type Short Type Stub End (Lap Joint Stub End) 
Nominal Size 1" (DN25)
Wall Thickness Schedule 10 (SCH10S)
End Connection Butt-weld beveled end / Lap joint flanged face
Chemical Composition (Cu/Ni/Fe/Mn) 88.6% min / 9.0-11.0% / 1.0-1.8% / ≤1.0% 
Tensile Strength 303-414 MPa (44,000-60,000 psi) 
Yield Strength (0.2%) ~110-135 MPa (16,000-20,000 psi)
Elongation 30-42% 
Density ~8.94 g/cm³
PREN Value ~26

3. Application / Usage

This stub end is ideal for seawater and corrosive fluid systems requiring frequent disassembly:

  • Marine & Shipbuilding: Seawater cooling systems, firewater lines, ballast systems 

  • Offshore Oil & Gas: Seawater injection systems, heat exchangers 

  • Desalination Plants: Seawater intake, reverse osmosis feed lines 

  • Power Generation: Condenser cooling water systems 

  • Chemical Processing: Corrosive fluid handling, where frequent pipeline dismantling is needed 

4. Advantages

  • Superior Corrosion Resistance: Exceptional resistance to seawater, pitting, crevice corrosion, and stress corrosion cracking; called "offshore engineering alloy" for this reason 

  • Biofouling Resistance: Forms a protective oxide layer that naturally resists marine biological growth 

  • Cost-Effective: Offers a favorable balance of performance and cost compared to 70/30 CuNi or higher nickel alloys 

  • Easy Maintenance: Stub end design enables quick disassembly and reassembly without cutting or welding for pipeline inspection and cleaning 

  • Excellent Weldability: Readily weldable using standard GTAW processes with matching ERCuNi filler 

5. Functions

The stub end provides a detachable, leak-proof connection point within a piping system. When welded to the pipe end, its lapped face forms a seal with a lap joint flange and gasket, enabling the flange to rotate freely for bolt-hole alignment . This design is particularly useful for systems requiring frequent maintenance, cleaning, or component replacement .

6. Installation Instructions

  1. Preparation: Degrease and clean pipe ends and stub end weld areas thoroughly; CuNi requires a higher degree of cleanliness than steel

  2. Alignment: Accurately align the stub end's beveled end with the pipe end, ensuring proper fit-up

  3. Welding: Use GTAW (TIG) process with ERCuNi filler wire (AWS A5.7); use 100% argon shielding; back purge recommended for root pass to prevent internal oxidation 

  4. Assembly: Slide the lap joint flange over the stub end, place a gasket between the lapped faces, and tighten bolts evenly

  5. Post-Weld: No post-weld heat treatment required; clean with stainless steel brush to leave a bright finish

7. Precautions

  • Cleanliness: Requires a higher degree of cleanliness than carbon steel fabrication to prevent weld contamination

  • Temperature Limit: For aqueous corrosion service, limit to approximately 470°C; verify system conditions

  • Welding Heat Input: CuNi puddle is sluggish with an oxide film; requires appropriate amperage control

  • Compatibility: Not recommended for use with nitric acid or ammonia systems

  • Lap Face Protection: Protect the lapped face from scratches or damage during handling and installation

8. Shipping & Delivery

  • Standard delivery time is typically 15–30 days, subject to order quantity and specification availability 

9. Payment Terms

  • Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit) 

10. Packaging

  • Products are securely packed in plywood cases or wooden crates with internal cushioning to ensure safe transportation and prevent damage during transit 

11. After-Sales / Return & Warranty Policy

  • All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available

  • In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports

  • Specific return, exchange, and warranty terms are subject to the final sales contract agreement.

Butt-welding Pipe Fittings Short Type Stub End CuNi9010 1" SCH10 ASME B16.9

Butt-welding Pipe Fittings Short Type Stub End CuNi9010 1" SCH10 ASME B16.9


FAQ

1. Are you trading company or manufacturer ?
    We are manufacturer ,You can see the certification.
2. How long is your delivery time?
    Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
    Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
    Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.