-
Butt Weld Fittings
-
Stainless Steel Elbow
-
Stainless Steel Tee
-
Stainless Steel Reducer
-
Stainless Steel Pipe Cap
-
Duplex Stainless Steel Pipe
-
Stainless Steel Stub Ends
-
Forged Pipe Fittings
-
Forged Steel Flanges
-
API Carbon Steel Pipe
-
Stainless Steel Seamless Pipe
-
Stainless Steel Welded Pipe
-
Nickel Alloy Pipe
-
Hastelloy Pipe
-
Copper Nickel Tube
-
Stainless Steel Plate
-
Stainless Steel Bars
-
Spiral Wound Gasket
-
Cast Acrylic Sheet
-
Brazil---AimeeIn the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate. -
Thailand ---Dave MulroyASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner . -
USA ---AlfaroASTM A182 F55 Super Duplex Flange ,Good quality , we like that ! And delivery time in time also ,very professional.
Butt-welding Pipe Fittings 180D Long Radius Elbow 2" SCH20 Inconel 625 Nickel Alloy ASME B16.9
| Payment | T/T | Productname | Butt Weld Fittings |
|---|---|---|---|
| Technics | Casting | Usage | Oil Gas Water Industrial |
| Wallthickness | Schedule 10 To Schedule XXS | Connection | Butt Welded |
| Pressurerating | Class 150 To Class 2500 | Packing | Wooden Case,In Wooden Cases Or Pallets |
Butt-welding Pipe Fittings 180D Long Radius Elbow 2" SCH20 Inconel 625 Nickel Alloy ASME B16.9
1. Product Description
This product is a butt-welding 180-degree Long Radius (LR) elbow manufactured from Inconel 625 (UNS N06625) nickel-chromium alloy in accordance with ASME B16.9 and ASME B16.28 standards . Inconel 625 is a solid-solution strengthened nickel-based superalloy containing niobium (Nb) and molybdenum (Mo), which impart exceptional high-temperature strength, oxidation resistance, and outstanding corrosion resistance in aggressive environments . The 180-degree LR elbow features a radius of curvature equal to 1.5 times the pipe diameter (R = 1.5D), enabling a complete 180° flow reversal with minimal pressure drop . This 2" Schedule 20 fitting is designed for permanent butt-weld connection in extreme service piping systems.
2. Key Product Parameters
| Parameter | Details / Range |
|---|---|
| Dimensional Standard | ASME B16.9, ASME B16.28 |
| Material Standard | ASTM B366 / ASME SB366 |
| Material Grade | Inconel 625 |
| Type | 180° Long Radius Elbow (LR, R = 1.5D) |
| Nominal Size | 2" (DN50) |
| Wall Thickness | Schedule 20 (SCH20) |
| End Connection | Butt-weld ends (beveled per ASME B16.25) |
| Bend Angle | 180 Degrees |
| Chemical Composition | Ni: 58% min, Cr: 20-23%, Mo: 8-10%, Nb+Ta: 3.15-4.15%, Fe: 5% max |
| Tensile Strength | 830 MPa (120,000 psi) min |
| Yield Strength (min) | 414 MPa (60,000 psi) |
| Elongation | 30% min |
| Density | 8.44 g/cm³ |
| Max Service Temp | Up to 982°C (1800°F) for oxidation resistance |
3. Application / Usage
This 180° LR elbow is ideal for extreme high-temperature and severely corrosive environments:
-
Aerospace: Exhaust systems, turbine engine components
-
Chemical & Petrochemical Processing: High-temperature reactors, heat exchangers, sour gas service
-
Oil & Gas: Offshore platforms, subsea piping, seawater injection systems
-
Power Generation: Superheater tubing, nuclear reactor components
-
Marine Engineering: Seawater systems requiring chloride corrosion resistance
4. Advantages
-
Superior High-Temperature Strength: Nb and Mo solid-solution strengthening provides exceptional creep and rupture resistance up to 982°C
-
Excellent Corrosion Resistance: Outstanding resistance to chloride pitting, stress-corrosion cracking, oxidation, and carburization in severe environments
-
Long Radius Design: R=1.5D ensures smooth flow reversal with minimized turbulence and pressure drop
-
Excellent Weldability: Does not require complex preheat or post-weld heat treatment (PWHT)
-
Good Fabricability: Forgiving in weld repairs; no post-weld heat treatment required for routine applications
5. Functions
The 180° LR elbow changes the direction of fluid flow within a piping system by a complete 180-degree reversal, forming a "U" shape that enables pipes to fold back parallel . This design is particularly useful for compact pipeline layouts, bypassing obstacles, creating return flow, or installation in space-limited areas where complete flow reversal is required .
6. Installation Instructions
-
Preparation: Mechanically clean using dedicated tools to prevent contamination; Inconel requires a higher degree of cleanliness than steel
-
Edge Preparation: Machine bevel angle per joint preparation requirements
-
Alignment: Accurately align the elbow with connecting pipes; maintain proper fit-up
-
Welding: Use GTAW (TIG) or GMAW (MIG) process with ERNiCrMo-3 (Inconel 625 filler) per AWS A5.14 . Shielding: 100% Argon; back purge required for root pass to prevent oxidation . Use stringer beads (avoid wide weave)
-
Parameter Control: Heat input controlled to avoid hot cracking. Interpass temperature ≤ 175°C
-
Post-Weld: No post-weld heat treatment required for routine corrosion performance . Remove heat tint and clean to bright finish.
7. Precautions
-
Cleanliness: Requires a higher degree of cleanliness than steel; use dedicated tools for nickel alloys to prevent iron pickup
-
Hot Cracking Sensitivity: Use over-alloyed filler (ERNiCrMo-3) and control heat input to minimize hot cracking risk
-
Interpass Temperature: Must be maintained below 175°C (350°F) to avoid microfissuring
-
Back Purging: Essential for full-penetration joints to prevent internal oxidation and preserve corrosion resistance
-
No PWHT: Not required in many applications due to solid-solution strengthening, but follow supplier guidance for specific designs
8. Shipping & Delivery
-
Standard delivery time is typically 15–30 days, subject to order quantity and specification availability
9. Payment Terms
-
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit)
10. Packaging
-
Products are securely packed in wooden boxes or plywood cases to ensure safe transportation and prevent damage during transit
11. After-Sales / Return & Warranty Policy
-
All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) and Third-Party Inspection available
-
In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports
-
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

