Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | CHINA |
---|---|
Brand Name: | TOBO |
Certification: | ISO/TUV/SGS |
Model Number: | Hastelloy C276 |
Minimum Order Quantity: | 1pc |
Price: | Negotiation |
Packaging Details: | Wooden case |
Delivery Time: | 15workdays |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 100TON/MONTH |
Product Name: | Nickel Alloy Steel Pipe | Type: | Nickel Pipe |
---|---|---|---|
Shape: | Round Shape | Thickness: | 1 - 30 Mm |
Standard: | ASTM | Material: | Customed |
Packing: | Wooden Case | ||
High Light: | Hastelloy C276 Nickel Alloy Pipe Fitting,WPHC276 Nickel Alloy Pipe Fitting,SCH80 Nickel Alloy Pipe Fitting |
Nickel Alloy Pipe Fitting High Precision B366 WPHC276 Hastelloy C276 SCH80 1-24'' Threaded Tee
1. According to the diameter of pipe fittings, there are generally equal diameter tees, reducing tees, etc.
2. According to the direction of the branch pipe is divided into positive tee and oblique tee.
3,.According to the material divided into carbon steel, alloy steel, stainless steel,Tee joint,Tee joint Copper, pvc and other tee.
4.According to the connection mode divided into ordinary tee, threaded tee, sleeve tee, socket tee.
5.Tee expression method is as follows: for equal diameter tee, such as "T6" three means that the outer diameter is 6 inches of equal diameter tee.
Quick Details:
1.Grade: SS304/SS304L/SS316/SS316L/SS321/SS310S/SS317L/SS347H/SS316Ti/904L/S31803/S32205Product Description
2. Size: 1/8"-60"(1/2"-24" are butt weld, 26" and above are welded/seam)
3. Standard: Model 400 , DIN,JIS, GOST, BS,GB, etc.
4. Degree of elbow/bends: 90degree, 45degree, 180degree, 30degree, 60degree and etc.
5. Radius of elbow/bends: 1.5D,1D, 3D,5D,6D,10D,20D etc.
6. Wall thickness: SCH5S, SCH10S, SCH40S, STD, SCH40,SCH80S,SCH80,XS,SCH100,SCH120,SCH140,SCH160,XXS
7. Surface: can be picked, sand blasting, matt finished, mirror finished, brighten
8. Package can be plywood case, plywod pallet or according to customer's requirement.
9. T/T, L/C at sight, or others can be discussed.
10. Professional QC/QA team, inspect the raw material before production. Inspect the finished products before delivery. To be sure all products are good when customers receive.
Type | Tee | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
size | 1/2’’~48’’(Seamless);16’’~72’’(Welded) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Wall thickness | Sch5~Sch160XXS | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Manufacture Standard: | ASME B16.9,ASME B16.11,ASME B16.28 ,MSS SP-43,JISB2311,JIS B2312,JIS B2313,DIN 2605,DIN 2606 ,DIN2615,DIN2616 ,BG12459-90,GB/T13401,HGJ514 ,SH3408 ,SH3409, HG/T21635, HG/T21631, | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Material | Carbon steel, stainless steel, alloy steel, duplex stainless, nickel alloy steel | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Carbon steel | ASTM A234 WPB, WPC; | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stainless steel |
304/SUS304/UNS S30400/1.4301 304L/UNS S30403/1.4306; 304H/UNS S30409/1.4948; 309S/UNS S30908/1.4833 309H/UNS S30909; 310S/UNS S31008/1.4845; 310H/UNS S31009; 316/UNS S31600/1.4401; 316Ti/UNS S31635/1.4571; 316H/UNS S31609/1.4436; 316L/UNS S31603/1.4404; 316LN/UNS S31653; 317/UNS S31700; 317L/UNS S31703/1.4438; 321/UNS S32100/1.4541; 321H/UNS S32109; 347/UNS S34700/1.4550; 347H/UNS S34709/1.4912; 348/UNS S34800; |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
Alloy steel |
ASTM A234 WP5/WP9/WP11/WP12/WP22/WP91; ASTM A860 WPHY42/WPHY52/WPHY60/WPHY65; ASTM A420 WPL3/WPL6/WPL9; |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
Duplex steel |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
Nickel alloy steel |
Alloy 200/Nickel 200/NO2200/2.4066/ASTM B366 WPN; Alloy 201/Nickel 201/NO2201/2.4068/ASTM B366 WPNL; Alloy 400/Monel 400/NO4400/NS111/2.4360/ASTM B366 WPNC; Alloy K-500/Monel K-500/NO5500/2.475; Alloy 600/Inconel 600/NO6600/NS333/2.4816; Alloy 601/Inconel 601/NO6001/2.4851; Alloy 625/Inconel 625/NO6625/NS336/2.4856; Alloy 718/Inconel 718/NO7718/GH169/GH4169/2.4668; Alloy 800/Incoloy 800/NO8800/1.4876; Alloy 800H/Incoloy 800H/NO8810/1.4958; Alloy 800HT/Incoloy 800HT/NO8811/1.4959; Alloy 825/Incoloy 825/NO8825/2.4858/NS142; Alloy 925/Incoloy 925/NO9925; Hastelloy C/Alloy C/NO6003/2.4869/NS333; Alloy C-276/Hastelloy C-276/N10276/2.4819; Alloy C-4/Hastelloy C-4/NO6455/NS335/2.4610; Alloy C-22/Hastelloy C-22/NO6022/2.4602; Alloy C-2000/Hastelloy C-2000/NO6200/2.4675; Alloy B/Hastelloy B/NS321/N10001; Alloy B-2/Hastelloy B-2/N10665/NS322/2.4617; Alloy B-3/Hastelloy B-3/N10675/2.4600; Alloy X/Hastelloy X/NO6002/2.4665; Alloy G-30/Hastelloy G-30/NO6030/2.4603; Alloy X-750/Inconel X-750/NO7750/GH145/2.4669; Alloy 20/Carpenter 20Cb3/NO8020/NS312/2.4660; Alloy 31/NO8031/1.4562; Alloy 901/NO9901/1.4898; Incoloy 25-6Mo/NO8926/1.4529/Incoloy 926/Alloy 926; Inconel 783/UNS R30783; NAS 254NM/NO8367; Monel 30C Nimonic 80A/Nickel Alloy 80a/UNS N07080/NA20/2.4631/2.4952 Nimonic 263/NO7263 Nimonic 90/UNS NO7090; Incoloy 907/GH907; Nitronic 60/Alloy 218/UNS S21800 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
Package | Wooden cases, pallets, nylon bags or according to the customers' requirements | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
MOQ | 1pcs | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Delivery time | 10-100 days depending on quantity | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Payment terms | T/T or Western Union or LC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Shipment | FOB Tianjin/Shanghai, CFR, CIF, etc | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remarks | Other materials and drawings are available. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Welcome to contact us. |
Packaging & Shipping:
1. Surface: can be pickled, sand blasting, matt finished, mirror finished, brighten
2. Package can be plywood case, plywod pallet or according to customer's requirement.
3.8" and below size will be packed in plywood cases,10" and above size will be packed by plywood pallets
Our Services:
1. Price term: FOB shanghainingbo/tianjin xingang, CNF,CIF EXW and etc.
2. Payment term: 30% down payment, 70% balance payment against copy of B/L.
100% L/C at sight
3.Deliverty time: 5-20days, according to different quantity
4.Professional QC/QA team, inspect the raw material before production. Inspect the finished products before delivery. To be sure all products are good when customers receive.
FAQ:
Q:Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.